Facebook Rating
5.0
Based on 5 reviews
×
Google Rating
5.0
Based on 25 reviews
×
js_loader
 

Project Information

Clayton Colmer – Project Leader

This project was based in Urunga NSW. Clayton contacted us and briefed us on his requirements. As the site was contaminated with arsenic, and other harmful chemicals, our goal was to capture aerial images and videography throughout each stage of the project.

Technical Information

  • Aerial Images
  • Aerial Video Footage
  • Overlay Map
  • Filming of machines in each area.

Ready to get started?

Contact Mile High
Facebook Rating
5.0
Based on 5 reviews
×
Google Rating
5.0
Based on 25 reviews
×
js_loader